Tuesday, August 13, 2019

BMW CENTRAL BUILDING (Leipzig, Germany) Essay Example | Topics and Well Written Essays - 2500 words

BMW CENTRAL BUILDING (Leipzig, Germany) - Essay Example Name Tutor Task Date BMW CENTRAL BUILDING BMW central building in Leipzig Germany, is a magnificent building designed by Pritzker Prize together with Zaha Hadid architects, this happened in the year 2003. The building was designed with the concept of holding the integral sections that involved in the production of the BMW vehicles in one roof. Initially, the BMW real estate and facility management group had designed the three separate production units; the competition was put up to design the interlinked three core production units ( Aaron Betsky, 256). The best design by the Zaha Hadid and the Pritzker Prize to interlinked the three productions unit, which is the paint shop, the body building shop, and the assembly area; also included were administration, Restaurant for the staff. The conceptual idea behind the design, and building of this state of the art building which is a nerve centre of all the factory processes of assembling BMW vehicles was to allow easily movement of assembl ed body parts to be conveyed from one production unit of an elevated building to the other production unit. The focal point of designing and building an assembly hall, was to create enough space around the production line, was to give room for further expansion of the hall in the future without disruption to production. The magnificent building is not only functioning as a production piece of the factory, but also an epicenter of so many activities, including; the public relation area, offices, and the meeting room. The environmental approach was put into considerations, when the stipulate the use of water based paints to avoid environmental conflicts. The BMW central building is made up of several elevated conveyers which are made of a standard range of building materials like corrugated metals, channel glass and glass walls; this gave it a spectacular appearance and a unique design which stand out to be a unique building in Leipzig, Germany. The whole BMW central building covered 2.2 kilometer square that is 540 acre piece of land. The fabrication of bodies’ hall covers 640,000 square feet; the paint shop is covering 270,000 square feet and the assembly hall which is the largest cover 1,075,000 square feet. Included in the structural design is the large parking yard, the integral structural feature has the dynamic spectacle where it allows the movement the inherent dynamism movement of car bodies and vehicles and the arrangement of the parking lots giving it a gorgeous look. The other unique features in the building are such like the strategy used to organize the cross section that connect the ground floor and the first floor, there are two sequences of terraced plates of staircases that were set up from the southern part of the building to the northern part of building. The other staircase moved straight up from the ground floor meeting the first cascade then moving up to the space projecting the entrance. The advantage is that the articulation of th e most recognizable domain within an overall field. The materials used in the internal organization and walls separating the conveyors allow visual communication much more among the staff of all the ranks; this is to avoid the common tradition of segregation of them into a status group. The designing and building of this centre followed the modern organization of the offices in such a way that can provide a working

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.